Out of stock
This item is currently out of stock and it may or may not be restocked.
Sold by Newegg

Shipped by Newegg

Shop it at NeweggBusiness.

Festivo 70 Inch Extra Wide TV Stand Console W/2 Swing Magnet Doors for TVs up to 80"-Natural

  • Natural raw wood finish with unique wood grain color variations adds rustic appeal
  • Adjustable open shelf and cabinets with magnetic door catches for customizable organization
  • Cable management cutouts ensure a neat and organized entertainment space
  • Top-quality hardware ensures durability and long-lasting use
  • Extra-wide design accommodates larger TVs and provides ample storage space
  • Rustic charm complements various interior styles
  • Ideal for enhancing your entertainment setup and showcasing your TV
  • Sturdy construction for reliable support and stability
Overview
Specs
Reviews

Enhance your entertainment area with our premium 70-inch extra-wide rustic TV stand, designed for up to 80" flat panel TVs. Featuring natural raw wood and unique wood grain color variations, this stand adds a touch of rustic charm to your space. With adjustable shelves, cabinet storage, and cable management cutouts, it offers a neat and organized setup. Assembly is quick and easy with step-by-step instructions and all hardware included.KEY_TAB

  • Overall Dimensions: 70" W x 15.5" D x 30" H
  • Easy to assemble with detailed instruction and all hardware included
  • Designed for most 65", 70", 75" flat panel TVs, up to 80 inchesKEY_TAB

Features:

  • Natural raw wood finish with unique wood grain color variations adds rustic appeal
  • Adjustable open shelf and cabinets with magnetic door catches for customizable organization
  • Cable management cutouts ensure a neat and organized entertainment space
  • Top-quality hardware ensures durability and long-lasting use
  • Extra-wide design accommodates larger TVs and provides ample storage space
  • Rustic charm complements various interior styles
  • Ideal for enhancing your entertainment setup and showcasing your TV
  • Sturdy construction for reliable support and stability

Warranty & Returns

Warranty, Returns, And Additional Information

Return Policies

Manufacturer Contact Info

LOADING...